1
|
- Sandra S. Patty
- PPRP - Manager, Transmission Projects
- Sugarloaf Citizen's Association Annual Meeting
- April 28, 2007
|
|
2
|
- Regulation of Power Plants and Transmission Lines through the Public
Service Commission’s Certificate of Public Convenience and Necessity
(CPCN) process
- Broad Regulatory Authority encompassing virtually all issues impacted by
power plant and transmission line
development, as well as major permits
- Provides a formal judicial forum for the comprehensive review of all
issues related to siting, construction, and operation in a one-stop
format
|
|
3
|
- PJM Interconnection, the regional transmission organization that
operates in the mid-Atlantic region, plays a vital role in the U.S.
electric power system
- Ensures the reliability of the electric power supply system in 13
states and the District of Columbia
- Operates an efficient, effective wholesale electricity market
- Manages a long-term regional electric transmission planning process to
maintain the reliability of the power supply system
|
|
4
|
- Reliability Criteria
- North American Electric Reliability Council (NERC)
- Regional reliability council criteria
- Local transmission owner reliability criteria
- Generation Retirement
- As generation retires the transmission system may need to be reinforced
to move power into an area – load deliverability
- Generation Additions
- New sources of generation need to be able to be delivered to the larger
grid – generation interconnections
- Transmission Service Requests
- Request to move power from one area of the grid to another area
|
|
5
|
|
|
6
|
- Eastern PJM faces 2 significant problems
- Transmission congestion (current)
- Inadequate reliability (within 3 to 5 years)
- Transmission congestion occurs when low-cost generation cannot be
delivered to load centers due to insufficient transmission capacity
- This is a west-to-east problem
- Results in increased costs to Maryland consumers (2006 Bedington-Black
Oak congestion was $492 million)
- Reliability in Eastern PJM is currently adequate, but is anticipated to
deteriorate in the next few years without west-to-east transmission
upgrades and/or new plant construction in Eastern PJM
|
|
7
|
|
|
8
|
|
|
9
|
- Allegheny
- Allegheny and AEP Joint Venture
- Proposed 765 kV line from John Amos Power Plant, WV to Kemptown, MD
- PEPCO Holdings
|
|
10
|
|
|
11
|
|
|
12
|
- FERC is given authority under limited circumstances to issue permits
related to NIETCs
- Limited circumstances:
- Facilities located in states that do not have siting authority or state
law precludes consideration of interstate benefits
- Applicant does not qualify to apply for siting approval in state
because applicant does not serve end-use customers in that state
- State entity with siting authority withholds approval of facilities for
more than one year after application is filed
- State conditions proposal in such manner that will not significantly
reduce transmission congestion or will not be economically feasible
|
|
13
|
|
|
14
|
- Public participation programs
- Visual impact analysis
|
|
15
|
|
|
16
|
|
|
17
|
|
|
18
|
|
|
19
|
- DNR has a new GIS tool for viewshed analysis
- Collaboration with EarthData and Frederick County
- Examines geospatial data
- Creates 3D visualizations and modeling of project areas
- Complete with natural and cultural features
- Can incorporate existing or new data (including elevation) to:
- Look into and around a site
- “Fly through” an area or corridor, or
- Observe surroundings from a specific location
|
|
20
|
|
|
21
|
|
|
22
|
|